Talk to an Expert

Highlights


Benefits

  • Reduce fractures, fluid loss, kicks, breakouts and hole collapse risks while tripping
  • Maximize tripping speeds safely and consistently
  • Minimize NPT and ILT
  • Improve visualization for faster, better decisions
Features

  • Reliable automation algorithm
  • Accurate digital twin with real-time updates
  • Automated warnings and alerts
Applications

  • Operations prone to tripping-related NPY
  • Managed-pressure-drilling operations
  • Wells with a high risk of swab-surge
  • Deepwater and HP-HT wells
  • High-spread cost operations
Overview

Thei-Trak™ tripping optimization servicefrom Baker Hughes automates tripping processes to let you safely maximize your pipe-tripping speeds while minimizing the risk of swab or surge events—protecting your wellbore while helping save you time and money.

Tripping takes up approximately 30% of well construction time on most wells. The i-Trak tripping optimization service safeguards against non-productive time (NPT) and reduces invisible lost time (ILT) during tripping by automatically monitoring, prescriptively advising, and helping control off-bottom movements of drilling and non-drilling assemblies at all depths and phases of the well-construction process.

The i-Trak automated tripping optimization service calculates optimum trip speeds for each direction (run-in or pull-out-of-hole) and operational scenario (pumps-on/pumps-off) at any point in time by leveraging the digital twin and applying a configurable safety margin to the trip speed limit. The service also compensates for pressure and temperature effects in any wellbore environment — offering safe, automated tripping control in deepwater, high-temperature and high-pressure (HP-HT), and managed-pressure drilling (MPD) applications.


Get in touch with an expert.

Your request has been submitted.
Thank you for your interest. A specialist will be in touch with you shortly.